Safety Work Method Statement and Work Request
Safety Work Method Statement and Work Request
date_time
2026-01-15 10:32:37
id
Risk Assessment ID
CONTRACT JOB OWNER DETAILS
Contract Job Owner Details
Contract Job Owner Name
Contract Job Owner Location
Contract Job Owner Department
Contract Job Owner Telephone Number
Job / Task Details
Will this work come under CDM 2015
SWMS Start Date Requested
SWMS Time Requested
SWMS Plant Location
SWMS Area or Equipment
SWMS Brief Description of Work
SWMS Has Local Access Egress been agreed
SWMS Is Work Start Date Agreed
SWMS Company Authorisation Name
SWMS Has Pre-Work Discussion Taken Place
SWMS Pre-Work Discussion Contractor Name
SWMS Pre-Work Discussion Company Name
SWMS Has the Job Work Location Been Inspected
SWMS Job Work Location Inspect Contractor Name
SWMS Job Work Location Inspect Company Name
SWMS Estimated Duration (Work Days)
SWMS Purchasing Conditions Applicable
What Type of Supervision is this Contract
Have Site Regulations Been Employed to Complete SWMS
SWMS Is this the first time Contractor has been used by Company
SWMS Company Purchase Order Number
SWMS Any Agency Personnel
SWMS Lone Worker Application
SWMS Any Contractor Employees Under 18
SWMS Any Contractor Consultant Employees
SWMS Any Contractor Employees Over 65
PART 1 - SAFETY ASPECTS
1.1 Hazards & Risks
Refer to the Hazard Identification Number
Refer to the Risk Assessment Number
1.2 Protective Equipment and Clothing
Safety Helmet
Safety Helmet Details
Safety Footwear
Safety Footwear Details
Eye Protection
Eye protection Details
Hearing Protection
Hearing Protection Details
High Visibility Wear
High Visibility Wear Details
Personal Dangerboards
Personal Dangerboards Details
Respiratory Protection
Respiratory Protection Details
Breathing Apparatus
Breathing Apparatus Details
1.3 COMAH Substances
Are COMAH Substances Involved
Is Safety Critical Equipment Involved
1.4 Proximity Working
Will the work be on or near the following, please tick Yes or No.
Company Hazardous Operations
Bus - Bars or Open Electrical Equipment
Chemical Plant or By-Products
Conveyors
Excavations or Fall Openings
Hot Products or Material and Substances
OH Cranes or Crane Tracks
Open Water or Liquid Tanks or Channels
Overhead Cables
Rail Tracks
Roads or Walkways
Underground Areas
Site Traffic or Transport
1.5 Manual Handling
Manual Handling
Are Manual Handling Equipment or Procedures Required
Manual Handling Details
1.6 COSHH
COSHH Not Applicable
Are COSHH Regulations relevant
Have COSHH Assessments been Supplied
COSHH Details
COSHH Documentation
COSHH Link
1.7 Guarding
Task necessitate working within Area Guarded Plant
Area Guarded Plant Details
Task required removal of fixed guarding
Fixed Guarding Removal Details
1.8 Fire Prevention Assessment
(a) Is acetylene to be used
Will the work involve bringing onto site any heat source or spark forming equipment?
flammable Liquids or gases
Working involves fire extinguishers
Will any fire barriers be breached
Breached Fire Barrier Numbers
Breached Fire Barrier Location Details
Cause False fire Alarms from fire detection equip
Identify any Hot Work in High Risk Areas
Type of fire extinguishers to be provided
Number of Fire Extinguishers Provided
Who will supply the fire extinguishers
Will a fire watcher be provided
How Many Fire Watchers
Will a fire blanket be provided
Who will supply the fire blanket
Is the area to be water flooded
PART 2 - CONTRACTOR PERSONNEL AND SAFETY TRAINING
2.1 Supervision
Working Party Leader Names 1
Working Party Leader Safety Passport No 1
Working Party Leader Names 2
Working Party Leader Safety Passport No 2
Working Party Leader Names 3
Working Party Leader Safety Passport No 3
Working Party Leader Names 4
Working Party Leader Safety Passport No 4
IS the WPL in Receipt of Supervisor National Safety Passport
supervisor_national_safety_passport No Details
Is the WPL Site and Plant Inducted
Not Site or Plant Inducted Details
2.2 Contractor Personnel Training
Estimate Number of Personnel to be Employed
Contractors
Sub-Contractors
Agency Staff
Consultants
Self Employed
Are all Personnel in receipt of Valid Nation Safety Passport
Personnel No National Safety Passport Details
Are all Personnel Site and Plant inducted
Personnel Not Site or Plant Inducted Details
Contractor Personnel Competency Details
2.3 Sub-Contractor Personnel Training
Are all Sub-Contractors Craft/Trade Competent
Sub-Contractor Competency Details
Sub-Contractor Personnel Valid NSP
Sub-Contractor Personnel No Valid NSP Details
Sub-Contractor Personnel Site and Plant Inducted
Sub-Contractor Personnel not Site and Plant Inducted Details
2.4 Hours of Work
Will any of the contractors or other employees work:-
More than 16 hr shifts
More than 6 days in a week
PART 3 - PLANT EQUIPMENT, TOOLS AND TACKLE
3.1 Plant Equipment Tools Tackle Authorisation
Is Business Authorisation Required
Detail and List any Agreed Plant Equipment 1
Authorised By 1
Detail and List any Agreed Plant Equipment 2
Authorised By 2
3.2 Contractor Plant & Transport
Are there any Transport or Mobile Plant Requirements
Give Details of any Transport or Mobile Plant
Details of any Transport or Mobile Plant
3.3 Portable Tools
Tick the following yes if to be used
Cartridge Power Tools
Electrical Power Tools
Hydraulic Power Tools
Pneumatic Power Tools
Burning Gear
Cutting Gear
Heating Gear
Welding Gear
Cryogenic Freezing
Disc Cutters
Grinding Machines
Pressurised Jetting Gear
Power Saw or Cutters
3.4 Contractor Equipment and Tackle
Tick the following yes if to be used provide details below
Crane Cradle or Bosuns Chair
Gas Bottles
Jacking Equipment
Ladders or Steps
Platforms or Tressels etc
Scaffolding any type
Site Flood Lighting
Sky Lifts or Cradles
Slings or Lifting Tackle
GAs Equipment Fitted with FBA, NRV and Crimp fittings
Are Portable Lamps to be used
3.5 Contractor Passenger Vehicles
List any Company Vehicles - Reg - Fleet Number
3.6 Records
Will all Legal Mandatory Test Certs and Schedules be avalable
Detail Where these Legal and mandatory Records will be kept
Records Contact Name
Records Contact Phone Number
4.1 Isolation
Are Isolations required
Detail Electrical and Mechanical Isolations
Isolation Details
Detail who will apply isolation's
Electrical Cables to be cut or disconnected
4.2 Immobilisation
Are Immobilisations Required
Detail any Plant or Equipment to be immobilised
Immobilisation Details
Who will Apply Immobilisations
Are pressurised Systems to be broken into
4.3 Site Housekeeping
Will Walkways be kept clear
Will there be a need for storage on site
Will there be cabins offices or workshops onsite
Detail housekeeping Control Arrangements
4.4 Health and Hygiene
Are Occupational Health or Hygiene aspects Involved
Are Welfare Facilities to be provided
Provide Details of Welfare Facilities provided
4.5 Environmental Issues
Will any Rubbish or Waste burning be necessary
Will the work involve Waste discharge into drains
Will the work involve any air pollution
Will any forms of waste get into ground or land
Will there be any excessive noise pollution with this work
Are any wastes of any type produced taken from site
4.6 Monitoring and Final Inspection
Who will be responsible for H&S Safety Monitoring
Monitoring Frequency (Details)
Monitoring Records Location
Who will carry out Final Work check and Safety inspection
Will a record of (a) and (e) be Provided to contract job owner
Upload Monitoring Record Documentation
Monitoring Record Link