5 Steps Risk Assessment
- Identify the hazards
- Decide who might be harmed and how
- Evaluate the risks and decide on control measures
- Record your findings and implement them
- Review your assessment and update if necessary
PDF
Risk Assessment Serial Num
Wibble-00003
Please select
Installation of new electrical panel
Hazard Identification & Risk Assessment
Exposed Electrical Conductors/Equipment in work area
Electric Shock
fgh
Supplier
Catastrophic (5)
Occurred in my Dept (5)
Supplier
Directly
None
List Conditional Formatting
Condition Formatting
colred
Condition Format
colred
5
Likely (5)
Medium (Isolation / distance) - (2)
Isolation of Electric using LOTO
Site
17-06-2020
25-06-2020
10-06-2020
Engineering Manager
Contract Job Owner
Risk Assessment Seq ID
Risk Assessment - 0046
Work Method Statement
1
Job Description
Arrive on-site
Site traffic
1.3 COMAH Substances
gfddfgdf
