5 Steps Risk Assessment

  • Add
  • Group by
    • None
    • Risk Assessment Number
    • Contractor Name
    • Description of Task
    • Hazard Description
    • Risk Description
    • Details of Hazard
    • Hazard Potential Consequences
    • Hazard Probability of Occurrence
    • Hazard Rating
    • Initial Severity Ranking
    • Initial Likelihood Ranking
    • Initial Hierarchy of control Measures
    • Current Risk Rating
    • Hazard Action
    • Hazard Actioned by Who
    • Hazard Action Completion Date
  • PDF
Risk Assessment Number Contractor Name Description of Task Hazard Description Risk Description Details of Hazard Hazard Potential Consequences Hazard Probability of Occurrence Hazard Rating Initial Severity Ranking Initial Likelihood Ranking Initial Hierarchy of control Measures Current Risk Rating Hazard Action Hazard Actioned by Who Hazard Action Completion Date
No records
Wibble-00001 McDonalds Carrying out work on Conveyors - 144 / 155
  • Confined spacework is necessary
  • Fork Lift Trucks operate in work area
  • Oxygen Depletion
  • Crushing
  • Liquid Nitrogen
  • Possibility of interface with FLTS onsite
  • Moderate (2)
  • Moderate (2)
  • Occurred in my Company (3)
  • Occurred in my Company (3)
  • 5
  • 5
  • 2
  • 0
  • Unlikely (3)
  • Barely conceivable (0)
  • Moderate (Engineering Controls) - (3)
  • Very High (Elimination) - (0)
  • 5
  • 0
  • dfgd
  • Contractor
  • Contractor
  • 21-05-2020
Edit View
Wibble-00003 Please select Installation of new electrical panel
  • Exposed Electrical Conductors/Equipment in work area
  • Electric Shock
fgh
  • Catastrophic (5)
  • Occurred in my Dept (5)
10
  • 5
  • Likely (5)
  • Medium (Isolation / distance) - (2)
10 Isolation of Electric using LOTO
  • Site
  • 17-06-2020
Edit View
AANJ-00004 Please select
  • Construction taking place in area
  • Falling Objects
f
  • Severe (3)
  • Occurred in my Company (3)
6
  • 3
  • Very unlikely (2)
  • Medium (Isolation / distance) - (2)
5 g
  • Site
  • 10-11-2027
Edit View
AANJ-00005 Swale Consulting Ltd Tester
  • Flames in work area
  • Burns
Work adjacent to furnace
  • Minor (1)
  • Not in my Industry (1)
2
  • 1
  • Extremely unlikely (1)
  • Medium (Isolation / distance) - (2)
2 sff
  • Third Party
  • 04-06-2020
Edit View
Wibble-00006 Thorne International Boiler Services tfyfgyfy
  • Exposed Electrical Conductors/Equipment in work area
  • Falling Objects
gf
  • Minor (1)
  • Occurred in my Industry (2)
3
  • 5
  • Likely (5)
  • Very Low (Discipline / Training) - (5)
10
  • Contractor
  • 09-06-2020
Edit View
Wibble-00007 Speedy Services
  • Flames in work area
  • Burns
f
  • Major (4)
  • Occurred in my Company (3)
7
  • 2
  • Unlikely (3)
  • Medium (Isolation / distance) - (2)
5 v
  • Third Party
  • 23-06-2020
Edit View
Wibble-00008 Speedy Services Install new signage
  • Rail Traffic operates in work area
  • Crushing
Plant Traffic
  • Moderate (2)
  • Occurred in my Company (3)
5
  • 3
  • Very unlikely (2)
  • Moderate (Engineering Controls) - (3)
5 dsdf
  • Site
  • 16-02-2021
Edit View