Username
Password
Remember Me
Log in
Create an account
Forgot your username?
Forgot your password?
Toggle Navigation
Home
Action Tracker
Risk Assessment Menu
Risk Assessment Overview
5 Steps Risk Assessment
Safety Work Method Statement
Work Method Statement
5 Steps Risk Assessment List
Safety Work Method Statement List
Work Method Statement List
5 Steps Risk Assessment List
5 Steps Risk Assessment
Add
Group by
None
Risk Assessment Number
Contractor Name
Description of Task
Hazard Description
Risk Description
Details of Hazard
Hazard Potential Consequences
Hazard Probability of Occurrence
Hazard Rating
Initial Severity Ranking
Initial Likelihood Ranking
Initial Hierarchy of control Measures
Current Risk Rating
Hazard Action
Hazard Actioned by Who
Hazard Action Completion Date
PDF
Risk Assessment Number
Contractor Name
Description of Task
Hazard Description
Risk Description
Details of Hazard
Hazard Potential Consequences
Hazard Probability of Occurrence
Hazard Rating
Initial Severity Ranking
Initial Likelihood Ranking
Initial Hierarchy of control Measures
Current Risk Rating
Hazard Action
Hazard Actioned by Who
Hazard Action Completion Date
2020-05-22 00:00:00 2020-05-22 00:00:00
(1)
No records
Wibble-00001
McDonalds
Carrying out work on Conveyors - 144 / 155
Confined spacework is necessary
Fork Lift Trucks operate in work area
Oxygen Depletion
Crushing
Liquid Nitrogen
Possibility of interface with FLTS onsite
Moderate (2)
Moderate (2)
Occurred in my Company (3)
Occurred in my Company (3)
5
5
2
0
Unlikely (3)
Barely conceivable (0)
Moderate (Engineering Controls) - (3)
Very High (Elimination) - (0)
5
0
dfgd
Contractor
Contractor
21-05-2020
Edit
View
2020-06-04 00:00:00
(1)
No records
Wibble-00003
Please select
Installation of new electrical panel
Exposed Electrical Conductors/Equipment in work area
Electric Shock
fgh
Catastrophic (5)
Occurred in my Dept (5)
10
5
Likely (5)
Medium (Isolation / distance) - (2)
10
Isolation of Electric using LOTO
Site
17-06-2020
Edit
View
2020-06-05 00:00:00
(3)
No records
AANJ-00004
Please select
Construction taking place in area
Falling Objects
f
Severe (3)
Occurred in my Company (3)
6
3
Very unlikely (2)
Medium (Isolation / distance) - (2)
5
g
Site
10-11-2027
Edit
View
AANJ-00005
Swale Consulting Ltd
Tester
Flames in work area
Burns
Work adjacent to furnace
Minor (1)
Not in my Industry (1)
2
1
Extremely unlikely (1)
Medium (Isolation / distance) - (2)
2
sff
Third Party
04-06-2020
Edit
View
Wibble-00006
Thorne International Boiler Services
tfyfgyfy
Exposed Electrical Conductors/Equipment in work area
Falling Objects
gf
Minor (1)
Occurred in my Industry (2)
3
5
Likely (5)
Very Low (Discipline / Training) - (5)
10
Contractor
09-06-2020
Edit
View
2020-06-22 16:06:00
(1)
No records
Wibble-00007
Speedy Services
Flames in work area
Burns
f
Major (4)
Occurred in my Company (3)
7
2
Unlikely (3)
Medium (Isolation / distance) - (2)
5
v
Third Party
23-06-2020
Edit
View
2021-02-16 16:23:00
(1)
No records
Wibble-00008
Speedy Services
Install new signage
Rail Traffic operates in work area
Crushing
Plant Traffic
Moderate (2)
Occurred in my Company (3)
5
3
Very unlikely (2)
Moderate (Engineering Controls) - (3)
5
dsdf
Site
16-02-2021
Edit
View
Safety Work Method Statement List
Safety Work Method Statement and Work Request
Add
Group by
None
date_time
id
Will this work come under CDM 2015
SWMS Start Date Requested
SWMS Time Requested
SWMS Plant Location
SWMS Area or Equipment
SWMS Brief Description of Work
SWMS Has Local Access Egress been agreed
SWMS Is Work Start Date Agreed
SWMS Company Authorisation Name
SWMS Has Pre-Work Discussion Taken Place
SWMS Pre-Work Discussion Contractor Name
SWMS Pre-Work Discussion Company Name
SWMS Has the Job Work Location Been Inspected
SWMS Job Work Location Inspect Contractor Name
SWMS Job Work Location Inspect Company Name
SWMS Estimated Duration (Work Days)
SWMS Purchasing Conditions Applicable
What Type of Supervision is this Contract
Have Site Regulations Been Employed to Complete SWMS
SWMS Is this the first time Contractor has been used by Company
SWMS Company Purchase Order Number
SWMS Any Agency Personnel
SWMS Lone Worker Application
SWMS Any Contractor Employees Under 18
SWMS Any Contractor Consultant Employees
SWMS Any Contractor Employees Over 65
Safety Helmet
Safety Helmet Details
Safety Footwear
Safety Footwear Details
Eye Protection
Eye protection Details
Hearing Protection
Hearing Protection Details
High Visibility Wear
High Visibility Wear Details
Personal Dangerboards
Personal Dangerboards Details
Respiratory Protection
Respiratory Protection Details
Breathing Apparatus
Breathing Apparatus Details
Site Traffic or Transport
Estimate Number of Personnel to be Employed
Are all Sub-Contractors Craft/Trade Competent
Sub-Contractor Competency Details
Sub-Contractor Personnel Valid NSP
Sub-Contractor Personnel Site and Plant Inducted
Is Business Authorisation Required
Detail and List any Agreed Plant Equipment 1
Authorised By 1
Detail and List any Agreed Plant Equipment 2
Authorised By 2
Are there any Transport or Mobile Plant Requirements
Give Details of any Transport or Mobile Plant
Details of any Transport or Mobile Plant
Tick the following yes if to be used
Cartridge Power Tools
Electrical Power Tools
Hydraulic Power Tools
Pneumatic Power Tools
Burning Gear
Cutting Gear
Heating Gear
Welding Gear
Cryogenic Freezing
Disc Cutters
Grinding Machines
Pressurised Jetting Gear
Power Saw or Cutters
PDF
date_time
id
Will this work come under CDM 2015
SWMS Start Date Requested
SWMS Time Requested
SWMS Plant Location
SWMS Area or Equipment
SWMS Brief Description of Work
SWMS Has Local Access Egress been agreed
SWMS Is Work Start Date Agreed
SWMS Company Authorisation Name
SWMS Has Pre-Work Discussion Taken Place
SWMS Pre-Work Discussion Contractor Name
SWMS Pre-Work Discussion Company Name
SWMS Has the Job Work Location Been Inspected
SWMS Job Work Location Inspect Contractor Name
SWMS Job Work Location Inspect Company Name
SWMS Estimated Duration (Work Days)
SWMS Purchasing Conditions Applicable
What Type of Supervision is this Contract
Have Site Regulations Been Employed to Complete SWMS
SWMS Is this the first time Contractor has been used by Company
SWMS Company Purchase Order Number
SWMS Any Agency Personnel
SWMS Lone Worker Application
SWMS Any Contractor Employees Under 18
SWMS Any Contractor Consultant Employees
SWMS Any Contractor Employees Over 65
Safety Helmet
Safety Helmet Details
Safety Footwear
Safety Footwear Details
Eye Protection
Eye protection Details
Hearing Protection
Hearing Protection Details
High Visibility Wear
High Visibility Wear Details
Personal Dangerboards
Personal Dangerboards Details
Respiratory Protection
Respiratory Protection Details
Breathing Apparatus
Breathing Apparatus Details
Site Traffic or Transport
Estimate Number of Personnel to be Employed
Are all Sub-Contractors Craft/Trade Competent
Sub-Contractor Competency Details
Sub-Contractor Personnel Valid NSP
Sub-Contractor Personnel Site and Plant Inducted
Is Business Authorisation Required
Detail and List any Agreed Plant Equipment 1
Authorised By 1
Detail and List any Agreed Plant Equipment 2
Authorised By 2
Are there any Transport or Mobile Plant Requirements
Give Details of any Transport or Mobile Plant
Details of any Transport or Mobile Plant
Tick the following yes if to be used
Cartridge Power Tools
Electrical Power Tools
Hydraulic Power Tools
Pneumatic Power Tools
Burning Gear
Cutting Gear
Heating Gear
Welding Gear
Cryogenic Freezing
Disc Cutters
Grinding Machines
Pressurised Jetting Gear
Power Saw or Cutters
Delete
Copy
No records
2020-05-18 16:41:00
1
18-05-2020
16:42:00
Edit
View
Delete
Copy
2020-05-18 16:58:00
2
Dummy
Edit
View
Delete
Copy
2020-05-18 17:06:00
3
Dummy
Edit
View
Delete
Copy
2020-05-18 17:18:00
4
21-05-2020
dfhd:00:00
Dummy
dfhdhd
Edit
View
Delete
Copy
2020-05-18 17:19:00
5
15-05-2020
poiuytr:00:00
t link to Separate table
weeqqewq
Edit
View
Delete
Copy
2020-05-18 17:21:00
6
05-05-2019
17:32:00
t link to Separate table
Furnaces
Edit
View
Delete
Copy
2020-05-18 18:50:00
7
Dummy
Contractor Supervised
Edit
View
Delete
Copy
2020-05-19 15:35:00
8
29-05-2020
Dummy
Contractor Supervised
Yes
Yes
Yes
Yes
Yes
Yes
Edit
View
Delete
Copy
2020-05-19 15:37:00
9
Dummy
Contractor Supervised
Yes
Yes
Yes
Yes
Edit
View
Delete
Copy
2020-05-19 16:41:00
10
16:15:00
Dummy
gf
Alec McDonald
Frank Green
Alec McDonald
Frank Green
4
1
Contractor Supervised
164789
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Edit
View
Delete
Copy
2020-05-19 17:16:00
11
::
Dummy
Contractor Supervised
Edit
View
Delete
Copy
2020-05-22 18:27:16
12
::
Dummy
Contractor Supervised
Edit
View
Delete
Copy
2020-08-11 11:21:00
13
::
Dummy
4
Company Supervised
Edit
View
Delete
Copy
Work Method Statement List
Work Method Statement
Add
Group by
None
date_time
id
Sequence of Activity
MS Activity
MS Define Major Hazards
SWMS Cross Reference
MS Safe Systems of Work
MS Contractor Personnel Responsible
PDF
date_time
id
Sequence of Activity
MS Activity
MS Define Major Hazards
SWMS Cross Reference
MS Safe Systems of Work
MS Contractor Personnel Responsible
2020-05-22 00:00:00
(1)
No records
2020-05-22 00:00:00
4
0
1.2 Protective Clothing and Equipment
Edit
View
2020-05-22 13:00:31
(1)
No records
2020-05-22 13:00:31
1
4
1.2 Protective Clothing and Equipment
Edit
View
2020-06-04 00:00:00
(1)
No records
2020-06-04 00:00:00
5
1
Arrive on-site
Site traffic
1.3 COMAH Substances
Edit
View
2020-06-05 00:00:00
(3)
No records
2020-06-05 00:00:00
6
0
1.2 Protective Clothing and Equipment
Edit
View
2020-06-05 00:00:00
7
0
1.2 Protective Clothing and Equipment
Edit
View
2020-06-05 00:00:00
8
0
1.2 Protective Clothing and Equipment
Edit
View
2020-06-22 16:06:00
(1)
No records
2020-06-22 16:06:00
9
0
1.2 Protective Clothing and Equipment
Edit
View
2021-02-16 16:23:00
(1)
No records
2021-02-16 16:23:00
10
0
Tester 2
1.2 Protective Clothing and Equipment
Edit
View