|
No records
|
|
Wibble-00001 |
McDonalds |
Carrying out work on Conveyors - 144 / 155 |
- Confined spacework is necessary
- Fork Lift Trucks operate in work area
|
|
- Liquid Nitrogen
- Possibility of interface with FLTS onsite
|
|
- Occurred in my Company (3)
- Occurred in my Company (3)
|
|
|
- Unlikely (3)
- Barely conceivable (0)
|
- Moderate (Engineering Controls) - (3)
- Very High (Elimination) - (0)
|
|
|
|
|
|
|
|
Wibble-00003 |
Please select |
Installation of new electrical panel |
- Exposed Electrical Conductors/Equipment in work area
|
|
fgh |
|
|
10 |
|
|
- Medium (Isolation / distance) - (2)
|
10 |
Isolation of Electric using LOTO |
|
|
|
|
|
AANJ-00004 |
Please select |
|
- Construction taking place in area
|
|
f |
|
- Occurred in my Company (3)
|
6 |
|
|
- Medium (Isolation / distance) - (2)
|
5 |
g |
|
|
|
|
|
AANJ-00005 |
Swale Consulting Ltd |
Tester |
|
|
Work adjacent to furnace |
|
|
2 |
|
|
- Medium (Isolation / distance) - (2)
|
2 |
sff |
|
|
|
|
|
Wibble-00006 |
Thorne International Boiler Services |
tfyfgyfy |
- Exposed Electrical Conductors/Equipment in work area
|
|
gf |
|
- Occurred in my Industry (2)
|
3 |
|
|
- Very Low (Discipline / Training) - (5)
|
10 |
|
|
|
|
|
|
Wibble-00007 |
Speedy Services |
|
|
|
f |
|
- Occurred in my Company (3)
|
7 |
|
|
- Medium (Isolation / distance) - (2)
|
5 |
v |
|
|
|
|
|
Wibble-00008 |
Speedy Services |
Install new signage |
- Rail Traffic operates in work area
|
|
Plant Traffic |
|
- Occurred in my Company (3)
|
5 |
|
|
- Moderate (Engineering Controls) - (3)
|
5 |
dsdf |
|
|
|
|